Skip to content
Database

Oakville trails and pathways, by type

The Town of Oakville's open trails layer, measured: kilometres by its own type and surface labels, on a map.

Kilometres in the Town's layer
377.3
Plus 3.9 km marked Proposed
Segments
4,822
Woodland Trail, km
145.6
Multi-use, km
104.8

Town of Oakville open data · read November 18, 2026

What this is

The Town of Oakville’s open trails layer records 377.3 kilometres of trail and pathway in 4,822 segments, and a further 3.9 km it marks Proposed. By the Town’s own labels, 145.6 km is Woodland Trail, 104.8 km Multi-use and 85.1 km Park Walkway. Asphalt (167.1 km) and crushed limestone (163.5 km) are the two main surfaces. On-road bike lanes are not in this layer and are not counted here. Layer read November 18, 2026.

To plan a walk or a ride, use the Town’s own maps: Recreational trails map and Trails and Cycleways map. The drawing here is simplified from the Town’s lines and is a guide to the figures, not a route planner.

Oakville trails and pathways by typeThe 4,848 segments of the Town of Oakville's trails layer drawn over its Official Plan communities, coloured by the Town's type label; segments marked Proposed are grey.Woodland TrailMulti-usePark WalkwayCrosstown or CorridorAccesswayService AccessOn RoadWoodland Trail (Proposed)Multi-use (Proposed)Park Walkway (Proposed)Accessway (Proposed)Service Access (Proposed)
Woodland TrailMulti-usePark WalkwayCrosstown or CorridorAccesswayService AccessOn RoadProposedOutlines are the Town’s Official Plan communities.

Kilometres by type

The types are the Town’s labels, exactly as its layer records them. The Town publishes no definition of them with the dataset, so none is given here; the surfaces beside each type are what the layer records for its segments.

Oakville trails and pathways by the Town's type label: kilometres, share of the network, segments, main surfaces and kilometres marked Proposed
Woodland TrailKilometres145.6Share39%Segments1,748Main surfacesCrushed Limestone 113.0 km, Asphalt 21.3 km, Concrete 3.3 kmProposed, km1.5
Multi-useKilometres104.8Share28%Segments748Main surfacesAsphalt 97.4 km, Concrete 7.0 km, Crushed Limestone 0.4 kmProposed, km0.9
Park WalkwayKilometres85.1Share23%Segments1,689Main surfacesAsphalt 39.9 km, Crushed Limestone 30.0 km, Concrete 8.8 kmProposed, km0.6
Crosstown or CorridorKilometres30.7Share8%Segments360Main surfacesCrushed Limestone 19.0 km, Asphalt 6.8 km, Concrete 3.2 kmProposed, km—
AccesswayKilometres7.5Share2%Segments203Main surfacesConcrete 6.4 km, Asphalt 0.6 km, Crushed Limestone 0.3 kmProposed, km0.7
Service AccessKilometres2.5Shareless than 1%Segments67Main surfacesCrushed Limestone 0.8 km, Permeable Interlock 0.7 km, Concrete 0.3 kmProposed, km0.2
On RoadKilometres1.1Shareless than 1%Segments7Main surfacesAsphalt 1.0 km, Concrete 0.1 kmProposed, km—

Lengths are computed by OakvilleIQ from the lines the Town publishes. Segments marked Proposed are counted only in the last column.


Surface, status and jurisdiction

Oakville trails and pathways by the surface the Town records: kilometres, share and segments
AsphaltKilometres167.1Share44%Segments1,997
Crushed LimestoneKilometres163.5Share43%Segments1,494
ConcreteKilometres29.1Share8%Segments867
InterlockKilometres6.1Share2%Segments193
NaturalKilometres3.1Shareless than 1%Segments36
Tar and chipKilometres2.7Shareless than 1%Segments37
Over BridgeKilometres2.4Shareless than 1%Segments134
Wood chipKilometres1.8Shareless than 1%Segments13
Permeable InterlockKilometres0.7Shareless than 1%Segments18
Mixed SurfaceKilometres0.3Shareless than 1%Segments10
Over StairsKilometres0.2Shareless than 1%Segments14
FlagstoneKilometres0.2Shareless than 1%Segments4
Paving StoneKilometres0.1Shareless than 1%Segments5

Status. The layer gives every segment one of 3 status labels: Assumed (358.9 km), Unassumed (18.5 km) and Proposed (3.9 km). The labels are the Town’s and are shown as recorded; the figures on this page count every segment except those marked Proposed.

Jurisdiction. The layer records 362.3 km under the Town of Oakville and the rest under Provincial (13.5 km), City of Burlington (0.7 km), Schoolboard (0.3 km), Private (0.3 km) and City of Mississauga (0.2 km).


The longest named trails

The layer names 485 trails and walks, 275.9 km between them; the rest of its segments carry no name. These are the 15 longest, by the name on each segment. A trail the Town describes as one can appear under several names here, one for each bank of a creek for instance.

The 15 longest named trails in the Town of Oakville's trails layer: kilometres, the Town's type labels and jurisdiction
Bronte Creek Provincial Park TrailKilometres13.5TypesWoodland TrailJurisdictionProvincial
Sixteen Mile Creek Heritage Trail East BankKilometres9.1TypesWoodland Trail, Crosstown or Corridor, Service Access, Park WalkwayJurisdictionTown of Oakville
Crosstown Heritage TrailKilometres7.0TypesCrosstown or Corridor, Multi-use, Service AccessJurisdictionTown of Oakville
Fourteen Mile Creek TrailKilometres5.6TypesWoodland Trail, Park Walkway, Service Access, AccesswayJurisdictionTown of Oakville
Waterfront Heritage Trail WestKilometres4.5TypesCrosstown or Corridor, On Road, Service AccessJurisdictionTown of Oakville
Sixteen Mile Creek Heritage Trail West BankKilometres4.5TypesWoodland Trail, Crosstown or Corridor, Service AccessJurisdictionTown of Oakville
Glen Abbey TrailKilometres4.2TypesCrosstown or Corridor, Woodland Trail, AccesswayJurisdictionTown of Oakville
Sixteen Mile Creek Heritage Trail Inner ValleyKilometres4.1TypesWoodland TrailJurisdictionTown of Oakville
Interprovincial Pipeline TrailKilometres3.7TypesCrosstown or Corridor, Multi-use, Service AccessJurisdictionTown of Oakville
16 Mile Sports Park WalkwayKilometres3.7TypesPark Walkway, Service Access, On RoadJurisdictionTown of Oakville
Joshua Creek TrailKilometres3.6TypesWoodland Trail, Service AccessJurisdictionTown of Oakville
Iroquois Shoreline Woods Park TrailKilometres3.5TypesWoodland TrailJurisdictionTown of Oakville
Waterfront Heritage Trail CentreKilometres3.4TypesCrosstown or Corridor, On Road, Service AccessJurisdictionTown of Oakville
Indian Ridge TrailKilometres3.1TypesCrosstown or CorridorJurisdictionTown of Oakville
Morrison Valley North Trail East BankKilometres3.1TypesWoodland TrailJurisdictionTown of Oakville

What the Town says about trails and cycling

On its Trails page the Town describes “200+ kilometres of recreational trails” and lists the main ones by area of town. Its Heritage Trails page names five heritage trail systems and gives a length for each: Bronte Creek Trail (6.5 km), Joshua's Creek Trail (6 km), Crosstown Trail (12 km), Waterfront Trail (13 km) and Sixteen Mile Creek Trail (8.5 km). The open layer on this page records more kilometres than the Town’s trails figure. It holds park walkways, accessways and service accesses as well as trails, and the Town does not say which segments its own figure counts, so the two numbers are not the same measure.

Cycling on the road is a separate network. The Town’s Cycling Infrastructure page counts “over 260 kilometres” of on-road bike lanes and off-road cycling paths together, and describes four kinds of on-road feature:

  • Cycle lanes: a part of the road for cyclists only, marked by a painted line, a buffer or a physical barrier, with bicycle symbols on the pavement and signs along the road.
  • Sharrows: a bicycle symbol on a shared road showing where cyclists should generally ride.
  • Signed cycle routes: roads, typically with less traffic, signed to direct cyclists to the main network.
  • Paved shoulders: shoulders shared by cyclists, pedestrians and others, typically on rural roads.

Those on-road features are drawn on the Town’s Trails and Cycleways map from a layer the Town has not published in its open data catalogue, so OakvilleIQ does not reproduce or measure them. Nothing in the open trails layer says which of its segments are meant for cycling. The Town’s wider program, including pedestrian crossovers and cycling safety, is on its Active Transportation page. Town pages read November 18, 2026.


How this database works

The Town of Oakville publishes its trails as a dataset in its open data catalogue; it is the layer the Town’s own trail maps draw. OakvilleIQ reads each segment’s type, name, status, surface and jurisdiction as the Town records them, measures each line, and adds the lengths up under the Town’s labels. Nothing is reclassified. The lengths agree with the layer’s own length field to within half a percent.

The layer is a record of assets, not a statement of what is open today. The newest edit recorded in the layer is dated August 6, 2026. The dataset is rebuilt from the Town’s layer and the date it was read is shown.

Contains information licensed under the Open Government Licence — Town of Oakville. Licence.

Sources

Every factual claim above traces to one of these documents.

  1. Town of Oakville

    Trails (open data)

    Retrieved November 18, 2026

  2. Town of Oakville

    Open Data Licence

    Retrieved November 18, 2026

  3. Town of Oakville

    Open Data Procedure

    Retrieved November 18, 2026

  4. Town of Oakville

    Trails

    Retrieved November 18, 2026

  5. Town of Oakville

    Heritage Trails

    Retrieved November 18, 2026

  6. Town of Oakville

    Cycling Infrastructure

    Retrieved November 18, 2026

  7. Town of Oakville

    Active Transportation

    Retrieved November 18, 2026